October 1, 2020 - Teachers and students are loving the new spaces in the Fine Arts Facility! The walking track is enjoying the sound of little feet!
|
May 20, 2020 - Teachers are getting settled into their Fine Arts Classrooms. The walking track is complete.
|
|
March 30, 2020 - The Fine Arts Building is complete. Landscaping and irrigation is complete. The walking track is underway and near completion. |
|
February 18, 2020 - Final cleanup is underway in the Fine Arts Building. Landscaping and irrigation is complete. Work will commence on walking track within the month. |
|
January 7, 2020 - Final finishes are going up in the art and music classrooms.
|
|
November 13, 2019 - Masonry work is complete on Fine Arts Building. Canopy roof is being installed. First coat of paint is underway in classrooms. |
|
August 29, 2019 - Masonry work is underway. Interior walls, frames, and sheathing is being installed. |
|
September 30, 2019 - Woodridge slab has been poured. Building framing is underway. Mechanical ductwork is being installed.
|
|
June 18, 2019 - New playground and new gymnasium are complete. Demolition of south gym is underway.
|
|
March 22, 2019 - New playground equipment is being installed. Gymnasium flooring and striping has been installed. Striping at covered play area has been installed.
|
|
March 22, 2019 - Plywood panels are being installed in the new gym. Site work in underway for the new playground. Concrete under new covered play area is installed. Basketball goals have been installed. Tile is being installed in restrooms. Site drainage along Oakleaf is underway. |
|
February 8, 2019 - Concrete masonry units have been installed at the gym. Block filler is being installed on concrete masonry units. Metal panel and brick installation continues on gym exterior. |
|
January 9, 2019 - The pre-engineered metal building frame for the Gym and the Covered Play Area have been erected. Metal panel installation is underway on the Gym walls. Amphitheater seating between existing gym and new gym is in place. Water line installation is underway across the play field. |
|
December 2, 2018 - Foundation for the new gymnasium has been poured. The storm drain piping is being installed. Grading preparation for the amphitheater seating between existing gym and new gym is underway. The gymansium's Pre-Engineered Metal Building Frame was delivered last week. |
|
October 29, 2018 - Construction fencing is in place and contractor mobilized.Upper-gradee playground equipment has been removed. Building pad preparation for the Gym is underway. |
|
September 28, 2018 - Pending board approval, construction on the Fine Arts Building and Gymnasium should commence October 8th. Work will start with the Gymnasium and covered play area.
|
|